Rhino Project Solutions supports machinery manufacturers, engineering contractors and industrial operators with technical documentation and regulatory compliance requirements.
Auditors check the file. We build it.
Our specialist services include CE/UKCA conformity documentation, machinery risk assessments, technical files, O&M manuals, ATEX documentation and project quality records.
We help engineering teams produce structured, traceable documentation, identify compliance gaps and prepare machinery projects for assessment, commissioning and handover.
Machinery Regulation 2023/1230 — 20 January 2027.
From that date, Regulation (EU) 2023/1230 replaces the Machinery Directive for machinery placed on the EU and Northern Ireland markets. Technical Files structured for 2006/42/EC will need restructuring. We structure your files so the move is an upgrade, not a rebuild.
MD today, MR-ready tomorrow — find out more →Years of industrial engineering experience
Service lines — from Technical Files to Project Documentation
Project lifecycle stages — enquiry through handover & archive
Machinery Regulation transition deadline
Rhino Project Solutions helps machinery manufacturers, integrators, importers and project teams turn engineering, supplier, quality and compliance information into controlled, auditable project documentation.
A Technical File is not one document written at the end of a project. It is a controlled evidence trail, built up through the project life cycle. Auditors check the file. We build it, so when the Declaration is signed the evidence is already in place.
We work across engineering, procurement, suppliers, quality and your customer. We find documentation gaps early and see the documentation through to acceptance, the Declaration of Conformity and handover.
OEMs, system integrators and main contractors building new machinery or managing supplier documentation packages — from single Technical Files to full project documentation control.
Importers placing machinery on the GB or EU market, and project engineers who need compliance documentation as part of a live project rather than after commissioning is complete.
Documentation reviewed as engineering evidence, not paperwork to file. One point of coordination across engineering, controls, suppliers, quality and the customer.
30+ years of experience in special-purpose machinery and project engineering. David works directly on every project — there are no junior writers or template-fill subcontractors. The person who scopes the work is the person who delivers it.
We review documentation as engineering evidence, not just paperwork to file. Hands-on experience of CE/UKCA, machinery safety, ATEX/DSEAR, electrical, FAT, O&M and handover means the documentation reflects how equipment actually works.
Files structured so the move from 2006/42/EC to Regulation (EU) 2023/1230 is an upgrade, not a rebuild. With the January 2027 deadline approaching, this is the time to structure documentation for the transition — not after it arrives.
We can support a single stage or the whole project life cycle. Every stage adds evidence to the Technical File. See the full nine-stage map →
Scope of supply, applicable legislation and standards, documentation requirements, assumptions and exclusions.
Documentation plan, master document register, responsibilities, PDR/VDR structure and schedule.
Machinery classification, conformity route, directives and standards matrix, preliminary EHSR matrix.
EN ISO 12100 risk assessment that drives design decisions; EHSR matrix developed.
Rhino Project Solutions Ltd is a specialist project documentation and Technical File practice serving machinery and equipment manufacturers across the UK and Europe. We are positioned at the front end of compliance — producing documentation that is correct from the start.
David is a Principal Engineer with over 30 years of hands-on experience across nuclear, oil & gas, and industrial machinery sectors. His career spans fabrication and quality management, ATEX compliance, and CE/UKCA marking — giving him the technical depth to produce documentation that accurately reflects how equipment is designed, built, and operated.
Rhino Project Solutions is built on the principle that compliance documentation is an engineering discipline, not an administrative one. David works directly on every project — there are no junior writers or template-fill subcontractors.
Our expertise spans the full range of industrial machinery compliance obligations — from initial Directive scoping through to Final Declaration and Technical File retention.
CE and UKCA marking under 2006/42/EC and Machinery Regulation 2023/1230. Technical File preparation, risk assessment, Harmonised Standards traceability, and Declaration of Conformity across all machinery categories.
Equipment intended for use in potentially explosive atmospheres (ATEX Directive 2014/34/EU). Category assessment, ignition risk evaluation, and Technical File documentation to Group II/III equipment requirements.
Operation and Maintenance manuals structured to EN ISO 20607, IEC/IEEE 82079-1, and MD Annex I 1.7.4. Gap analysis service available for existing manuals assessed against the full 67-requirement framework.
30+ years of experience in special-purpose machinery and project engineering. David works directly on every project — no junior writers or template-fill subcontractors.
We review documentation as engineering evidence, not just paperwork to file. Qualifications in mechanical engineering and as a member of the IET.
CE/UKCA, machinery safety, ATEX/DSEAR, electrical, FAT, O&M and handover — across nuclear, oil & gas, and industrial machinery sectors.
Across engineering, controls, suppliers, quality and the customer. We find documentation gaps early and see the documentation through to acceptance and handover.
Files structured so the move to 2023/1230 is an upgrade, not a rebuild. Find out more →
Eight specialist service lines covering Technical Files, O&M manuals, gap analysis, risk assessment, supplier quality, CE/UKCA, ATEX/DSEAR, and project documentation control.
We build and maintain Technical Files (technical documentation). This covers the essential health and safety requirements (EHSR) matrix, the standards register, risk assessment evidence, drawings, calculations and test evidence, and drafting of the Declaration of Conformity or Declaration of Incorporation. We work to MD 2006/42/EC, the Supply of Machinery (Safety) Regulations 2008 and Regulation (EU) 2023/1230.
A structured checklist against every Essential Health and Safety Requirement in Annex I of the Machinery Directive or Machinery Regulation that applies to the machine — each clause confirmed as met, not applicable, or covered by a harmonised standard.
The harmonised standards register listing every standard applied, with version and scope — and the EN ISO 12100 risk assessment confirming hazards identified, risk reduction measures applied, and residual risks communicated.
Drawings, general arrangements, calculations and test evidence establishing that the machine meets the design requirements — together with the signed Declaration of Conformity or Declaration of Incorporation.
Under the Machinery Directive and Machinery Regulation, the manufacturer is legally required to hold the Technical File for a minimum of ten years from the date the machine was last manufactured, and to make it available to market surveillance authorities on request. A Technical File that cannot be produced is a compliance failure — not a documentation gap.
A complete, structured Technical File ready for 10-year retention: EHSR compliance matrix, harmonised standards register, EN ISO 12100 risk assessment, drawings and calculation references, test evidence index, and a signed Declaration of Conformity or Declaration of Incorporation in the correct format for the applicable legislation.
Structured to meet the content requirements of Annex VII (MD) or Annex IV (MR) — every mandatory element in place and traceable to the applicable requirement.
Clause-by-clause EHSR compliance checklist and a harmonised standards register, both structured for straightforward update as the machine evolves or regulations change.
Drafted in the correct format for the applicable legislation — CE (MD or MR) or UKCA — and ready for signature by the responsible person.
A Technical File is built stage by stage through the project life cycle — from Enquiry and contract award through to Handover and archive. The nine-stage build process, with Rhino's contribution at each stage, is set out on the How We Work page →
Every Technical File is scoped to the machine, the applicable legislation and the project stage. Tell us about your equipment and where you are in the project — we'll confirm the right approach and what's involved.
Start a Scoping Conversation →We independently review your existing Technical Files, O&M manuals and supplier documentation against the requirements that apply to them. You receive a findings register, a scorecard and a prioritised plan for closing each gap.
Many machinery manufacturers produce Technical Files and O&M Manuals that don't fully meet the requirements of the Machinery Directive, Machinery Regulation, or current harmonised standards. Our gap analysis service identifies exactly where your documentation falls short — and what needs to be added or restructured before your next audit or customer acceptance.
Every gap analysis is conducted against our 67-requirement scorecard mapped across all standards and the applicable EHSR. Each requirement is assessed as: Fully Met, Partially Met, or Not Addressed — with a reference to the specific standard clause or EHSR requirement and a recommendation for remediation. We also flag where the manual fails to reflect residual risks recorded in the machine's risk assessment (EN ISO 12100), as this is one of the most common and most significant compliance failures we encounter.
A structured findings memo setting out: the overall compliance score, section-by-section gap summary, priority remediation actions, and a recommended content outline for a restructured or updated manual.
Excel-based assessment across all three standards, with RAG status per clause and referenced evidence or gap.
Structured narrative report — overall score, section findings, remediation priorities, and recommended next steps.
A restructured content outline showing what a compliant manual for your equipment should contain, section by section.
From £950 + VAT for a single O&M Manual. Volume pricing available for OEMs with multiple product lines. Full manual redraft service available as a follow-on engagement.
We write instructions for use and O&M manuals to Annex I 1.7.4, EN ISO 20607 and IEC/IEEE 82079-1. They cover installation, commissioning, operation, maintenance, residual risks, safety messages and signs, spares and decommissioning. We also prepare digital instructions under the Machinery Regulation.
Product identification and intended use; residual risk warnings and safety instructions; transport, installation and commissioning guidance; operating procedures and controls description; maintenance schedule and procedures; troubleshooting; spare parts information; decommissioning guidance; and Declaration of Conformity reference.
A complete O&M Manual delivered in Microsoft Word format, ready for your layout or print-ready production. Structured for translation if multi-language versions are required. Reviewed against our 67-requirement scorecard before issue.
A compliant O&M Manual cannot be authored in isolation. Under the Machinery Directive and Machinery Regulation, the Essential Health and Safety Requirements (EHSR) — set out in Annex I — define what safety information must be communicated to the user. These requirements are not met by generic warnings: they are directly driven by the results of the machine's risk assessment.
We work from your risk assessment (EN ISO 12100) to ensure that every residual risk identified is reflected in the manual — in the correct section, at the correct severity level, and with the appropriate instruction. Where a formal risk assessment has not been completed, we can identify this as a gap and scope the additional work required as part of the authoring engagement.
Risk Assessment (EN ISO 12100)
Hazards identified, risk reduced, residual risks recorded.
EHSR Mapping (MD / MR Annex I)
Residual risks mapped to the applicable Essential Health & Safety Requirements.
O&M Manual Authoring
EHSR-driven safety content authored into the correct manual sections.
Full instruction set authored to EN ISO 20607, covering all mandatory sections from intended use through to decommissioning.
Every manual is verified against our 67-requirement scorecard across all three standards before issue — not after.
Word-format deliverable structured for straightforward revision cycles, version control, and translation into other languages.
From £2,500 + VAT for a single machine O&M Manual. Price depends on complexity and scope — confirmed after a brief technical scoping call. Gap analysis of an existing manual available as a separate service.
We support ATEX and DSEAR compliance. This covers equipment category and equipment protection level (EPL), ignition hazard assessment to EN ISO 80079-36/-37, Ex equipment schedules, certificate review, the hazardous-area content of the Technical File and EN 60204-1 electrical evidence.
Determination of Equipment Group (Group I for mining / Group II for surface industries) and Category (1, 2 or 3) based on the explosive zone in which the equipment will be installed — Zone 0/1/2 for gas-vapour-mist, Zone 20/21/22 for dust.
Systematic identification and assessment of potential ignition sources in accordance with EN ISO 80079-36 / EN ISO 80079-37. Each ignition source is evaluated against its likelihood under normal operation, expected malfunctions, and rare malfunctions.
Assembly of the complete ATEX Technical File including: equipment description, drawings, applicable standards, ignition risk assessment, test reports, ATEX marking scheme, and Declaration of Conformity in the format required by Annex VIII of the Directive.
Category 1 equipment (Zone 0/20) and Category 2 equipment (Zone 1/21) require EU-Type Examination by a Notified Body before the CE mark can be applied. Category 3 equipment (Zone 2/22) can follow internal production control with self-certification. We prepare your Technical File and supporting documentation to the standard required for Notified Body submission.
Complete ATEX Technical File; ignition risk assessment; ATEX marking scheme determination; Declaration of Conformity (EU 2014/34/EU format); and guidance on the applicable conformity assessment route for your equipment category.
Quoted on project scope — pricing depends on Equipment Group, Category, and complexity of the ignition risk assessment. Contact us to discuss your equipment and we'll confirm the right approach and indicative cost.
We prepare Inspection and Test Plans (ITPs), review Manufacturing Data Reports (MDRs), audit and inspect fabricators, verify certificates, close out non-conformance reports (NCRs) and recover missing supplier documentation.
Our supplier quality service covers the full scope of project supplier management:
We review the project ITP and MDP before the visit to understand the requirements and identify the key hold/witness points. On site (or remotely), we assess the supplier's or manufacturer's compliance against each requirement — examining records, physical evidence, and process controls. Findings are graded and compiled into a structured report.
A Word-format audit report setting out: scope and basis of assessment; findings against each ITP/MDP requirement; gap and action list with priority grading; and recommended close-out actions. Suitable for issue to the client or project team as documented assurance of supplier compliance.
Assessment of whether each hold point, witness point and test requirement in the Inspection Test Plan has been correctly actioned and recorded.
Review of the Manufacturers Data Pack against its index — identifying missing certificates, unsigned records, traceability gaps, and incomplete submissions.
Structured Word report with a prioritised gap and action list — each item cross-referenced to the ITP/MDP requirement and assigned a recommended close-out action.
Quoted per engagement based on scope, number of suppliers, and whether the audit is on-site or remote. Contact us with your project ITP and MDP details to discuss requirements and indicative cost.
We carry out risk assessment and risk reduction to EN ISO 12100. Each risk is traced through guarding and safety functions to the residual risks, warnings and training, and linked to the EHSR matrix.
Systematic identification of all hazards associated with the machine across its full life cycle — installation, commissioning, operation, maintenance, and decommissioning.
Each hazard is assessed for severity of harm and probability of occurrence. Risk reduction measures are applied in hierarchy order: inherently safe design, safeguarding, information for use.
Every residual risk and safety measure is cross-referenced to the applicable Essential Health and Safety Requirement in Annex I of the Machinery Directive or Machinery Regulation.
A structured EN ISO 12100 risk assessment document: hazard register with risk ratings, risk reduction measures applied at each stage, residual risk register, and an EHSR matrix showing how each requirement has been addressed. Suitable for inclusion in the Technical File and for Notified Body review.
We carry out risk assessments for new machinery, modified machines, and assemblies of machinery — including where multiple pieces of equipment are integrated and a single Declaration of Conformity must cover the whole.
Quoted per machine type. Scope depends on machine complexity, number of hazardous zones, and whether the assessment is standalone or forms part of a Technical File build. Contact us to discuss your equipment.
We establish the scope and conformity route for GB, the EU and Northern Ireland. That includes whether you are supplying machinery or partly completed machinery, the chain of Declarations of Conformity and Incorporation, assemblies of machinery, substantial modification, and the move from the Machinery Directive to the Machinery Regulation.
Machinery placed on the Great Britain market after 1 January 2021 requires UKCA marking under the Supply of Machinery (Safety) Regulations 2008. We establish the conformity route, assessment procedure, and Declaration of Conformity for the UK market.
Machinery for the EU market requires CE marking under the Machinery Directive (MD 2006/42/EC) until 20 January 2027, then under the Machinery Regulation (MR 2023/1230). We prepare Technical Files and Declarations for both Directive and Regulation.
Northern Ireland machinery must carry CE marking under EU law. We confirm which regime applies and prepare documentation accordingly, including where the same machine must serve both the GB and Northern Ireland markets.
A written conformity route report setting out: applicable legislation, equipment classification, assessment procedure, Declaration type, and any Notified Body involvement required. Provides the documented basis for the Technical File and the Declaration.
For manufacturers with live Technical Files built under 2006/42/EC, we advise on how to structure the transition to 2023/1230 — including which files need restructuring and which can be updated in place. See the MR 2027 page →
Contact us with your equipment details and target markets. We'll confirm the conformity route and advise on the scope of work required to achieve CE/UKCA marking.
We control Project Documentation Requirements (PDR) and Vendor Document Requirements (VDR). This covers document schedules and registers, customer submittals, revisions and transmittals, FAT/SAT records, status reporting, and the final customer dossier and handover pack.
We establish and maintain the Project Documentation Requirements (PDR) and Vendor Document Requirements (VDR) — the master lists of every document required from the project team and from suppliers, with status tracking from first submission to final acceptance.
Document schedules, revision registers, customer submittals, and transmittals — managed as a controlled register throughout the project. We track every revision cycle, action, and response so nothing falls through the gaps.
The final customer dossier and handover pack — compiled and checked against the PDR/VDR at project close-out. Covers FAT/SAT records, as-built status, O&M manual, Declaration of Conformity, and Technical File index ready for 10-year retention.
We can act as an embedded project documentation lead — working alongside your project team from award to handover. Or we can take on specific stages: the PDR/VDR at kick-off, the FAT documentation pack, or the handover dossier at close-out.
A controlled, auditable documentation set that moves with the project — document register, revision history, submittal log, and a complete, indexed handover dossier ready for customer acceptance. Every document traceable to the project PDR/VDR requirements.
Contact us at any project stage — we scope the engagement to what's needed, whether that's day-rate support across the project life cycle or fixed-price delivery of specific documentation stages.
We can support a single stage or the whole project life cycle. Every stage adds evidence to the Technical File.
A Technical File is not one document written at the end of a project. It is a controlled evidence trail, built up through the project life cycle. We structure the evidence at each stage so that when the Declaration is signed, it is already in place.
We can join a project at any stage and work to handover, or deliver a single stage — a risk assessment at Stage 4, a FAT pack at Stage 7, or a handover dossier at Stage 9. Each engagement is scoped to what the project needs.
We work across engineering, procurement, suppliers, quality and your customer. One point of coordination across all the evidence that flows into the Technical File and the handover dossier.
Regulation (EU) 2023/1230 replaces the Machinery Directive for machinery placed on the EU and Northern Ireland markets from 20 January 2027. From the same date, GB accepts machinery that conforms to the Regulation, alongside the SMSR 2008 route.
Technical Files structured for 2006/42/EC will need restructuring.
We review your live projects, templates and Technical Files against the Regulation's new requirements and structure the transition so the move to 2023/1230 is an upgrade, not a rebuild.
| Deliverable | Included |
|---|---|
| Gap analysis — existing Technical File vs Annex III and Annex IV requirements | ✓ |
| Updated EHSR checklist mapped to Machinery Regulation Annex III | ✓ |
| Harmonised Standards matrix refreshed for 2023/1230 | ✓ |
| Digital instructions assessment and recommendation | ✓ |
| Declaration of Conformity (Article 10 format) — updated or redrafted | ✓ |
| Safety-related software and control systems review memo | ✓ |
| Substantial modification applicability assessment | ✓ |
| Transition action plan with prioritised recommendations | ✓ |
MD today, MR-ready tomorrow.
With the January 2027 deadline approaching, early engagement allows time to address gaps without compliance pressure. Contact us to discuss your live projects and existing Technical Files.
Whether you need a scoping conversation, a quote, or an assessment of your existing documentation, we're ready to help.
A short scoping call is often the most useful first step. We can identify which services apply, what a typical engagement looks like, and how quickly we can move.
See How We Work →